|
Prezzo per Pezzo
Prezzo per Pezzo
|
|||
| Quantità Minima | 10-999 Pz | 1000-9999 Pz | 10000+ Pz |
| Tempo di consegna | 15 days | 28 days | 56 days |
| Hanger Bolt Kit Mounting | €8,88 | €8,44 | €7,99 |
| Numero Pannelli | 8 | ||
| Numero modello |
|
|
|---|---|---|
| Garanzia prodotto | 15 Anni | |
| Tipo | Tetto Spiovente | |
| Disposizione dell’istallazione | File | |
| Incorniciatura del Pannello | Incorniciato, Non incorniciato | |
| Orientamento del Pannello | Ritratto, Paesaggio | |
| Pendenza del Tetto |
|
|
| Resistenza al Vento |
|
|
| Resistenza alla neve |
|
|
| Materiali della Struttura di Supporto | Alluminio, Acciao Inossidabile | |
| Materiale dei Piccoli Componenti | Alluminio, Acciao Inossidabile | |
The Metal Roof Solar brackets is suitable for roofing with corrugated sheet metal, trapezoidal metal sheet. Hanger Bolt Kit is available for foot option, making the installation more convenience, competitive and reliable. The systems are fully comply with the Australian and other international standards on wind & snow load, making it suitable for a wide variety of climatic zones.
Tilt Angle:0°~ 45°
Wind Speed:60 m/s
Snow Load:2.4 kN/m^2
PV Module:Framed / Frameless
Module Orientation:Landscape / Portrait
Main Material:AL6005-T5 (Anodized), A2-70 (SUS304)
Color:Silver / Black
Warranty:15 Years
Wide Range of Selections
Waterproof EPDM Rubber Intergration
Pre-Assembled to Save Installation Time
Huge Energy is a manufacturer of solar mounting systems and a provider of solar energy solutions with 8 production facilities in China.
In the pursuit of excellence and technology innovation, and with over 100 R&D engineers' expertise, Huge Energy has obtained 80+ patents and our products have attained UL, TUV, JIS, AS/NZS, IEC, CE certifications, Wind Tunnel Tests, etc. Meanwhile, we have passed ISO9001, ISO45001, ISO14001, and other quality management system certifications.
Huge Energy has set up branches worldwide and has installed tens of thousands of photovoltaic projects worldwide with 15.4GW accumulative installed capacity by 2023.