JA Solar Co., Ltd announced that it supplied PERC bifacial double-glass modules for the 2.5MW Goodyear solar plant in Malaysia.
Malaysia's Minister of Energy, Science, Technology, Environment and Climate Change, Yeo Bee Yin attended the completion ceremony of the Goodyear 2.5MW solar power plant and delivered a speech at the event. Located in Shah Alam situated on the west coast of Peninsular Malaysia, the plant is owned by Goodyear.
JA Solar's modules are installed on the roof of Goodyear's facility. The solar power generated by the modules can meet 11.5% of its power consumption every day.